Our Sidewalk Installation and Repair programs (Pedestrian Transportation programs) provide for:
- A 50/50 cost share with residents whose public sidewalk(s) have been determined hazardous and require replacement.
- Repair and replacement of sidewalks adjacent to city property.
- Installation of new sidewalks where none exist. Sidewalk locations selected for new installation are determined based on assessment of the location(s), citizen and elected official requests.
Report Hazardous Sidewalks or Inquire about Installation of a New Sidewalk
Call us at 563.326.7923 during business hours or send us a request electronically, to report a hazardous sidewalk in need of repair, or to inquire about installation of a new sidewalk where none exists.
Interested in the 50/50 Cost Share Program?
Use this link for information on the City's 50/50 Cost Share Program